Ferry and delivery flights through Sri Lanka need a ground-support brief that reflects the aircraft’s actual status and the purpose of the movement. A newly delivered aircraft, an aircraft repositioning between operators and a maintenance-related ferry flight may have different documentation and support needs. They should not be treated as interchangeable simply because no fare-paying passengers are on board.
This guide supports flight departments and delivery planners routing between the Middle East and Asia. It addresses coordination on the ground; aircraft airworthiness, operating limitations and flight conduct remain the responsibility of the operator and relevant qualified personnel.
Describe the flight purpose accurately
State whether the movement is a delivery, ordinary repositioning or a ferry operation subject to particular authorisations. Identify the operator responsible for the flight and the registration that will be used. If ownership or registration is changing, clarify which documents apply at each stage.
Ask the permit coordinator to check the required application and supporting records against the actual operation. Do not assume that a non-revenue flight is exempt from landing or overflight requirements. The Sri Lanka permits service provides a route for coordinating the enquiry.
Build a document and aircraft brief
- Aircraft type, registration, operator and flight purpose.
- Routing, arrival and departure dates and UTC times.
- Relevant registration, insurance and airworthiness documentation as requested.
- Any special flight authorisation and operating limitations applicable to the movement.
- Crew details and the status of additional persons travelling on board.
- Ground equipment requirements, fuel needs and known technical constraints.
Provide documents through the agreed operational channel and check that they remain valid for the planned dates. A permit enquiry does not establish that the aircraft is airworthy or that an authorisation is recognised for the intended operation.
Select the stop around aircraft requirements
Compare the available Sri Lanka gateways against the operator’s performance assessment, current restrictions and ground needs. For a technical stop, the decisive questions include acceptance, equipment compatibility, fuel and the intended turnaround. For an overnight stop, parking and crew arrangements must be considered as well.
Do not rely on a previous visit by a similar aircraft as proof that the current movement can be accepted. Aircraft configuration, limitations and airport conditions may differ.
Confirm fuel and ground equipment together
Send the planned uplift and any aircraft-specific restrictions to the fuel coordinator. Confirm release or payment arrangements and what documentation the crew will need. Keep uplift planning consistent with the operator’s fuel and flight-planning decisions.
For ground handling, specify power, stairs, towing, servicing and attendance requirements. Where an inspection or technical intervention is planned, establish separately who is qualified and authorised to perform it. Ground coordination does not imply maintenance or release-to-service capability.
Plan for the people on board
Identify operating crew and anyone travelling in another capacity. Their entry, accommodation and transport requirements may differ. A delivery representative or engineer should not automatically be described as operating crew for immigration purposes.
For an overnight stay, agree hotel and transfers around the intended duty plan. If the onward flight depends on documentation being issued or a technical task being completed, brief that dependency early so cancellation and extension terms can be considered.
Reconfirm the onward movement
Before departure, verify that the aircraft identity, documents, permissions and receiving-airport arrangements match the latest plan. An extended stop can affect fuel, crew logistics and permission conditions. Maintain one current flight brief and obtain acknowledgement of material changes.
Frequently asked questions
Does “ferry flight” always mean the same type of operation?
No. Explain the purpose and aircraft status so the applicable requirements can be assessed.
Can a technical issue be resolved during the stop?
Only through appropriately qualified and authorised support. Confirm capability before planning a task.
Does a non-revenue flight need permission?
Check the requirements for the actual routing and operation; non-revenue status should not be treated as an exemption.
Official references
- Civil Aviation Authority of Sri Lanka — flight approvals and applicable requirements.
- Airport and Aviation Services (Sri Lanka) — airport information and access to aeronautical information.
Related Sri Lanka planning guides and services
- Aircraft Parking in Sri Lanka: Planning an Overnight or Extended Stay
- Changing a Sri Lanka Flight Schedule: Permits, Handling and Fuel Updates
- Jet A-1 Fuel Uplift in Sri Lanka: Planning, Release and Payment Checklist
Plan your Sri Lanka operation
For local coordination, send SEAS your flight requirements, including aircraft details, routing, dates and UTC times. You can also contact the operations desk at operations@seas.aero or +94 720 860 870.
Planning guidance published 1 October 2026. Confirm current AIP information, NOTAMs, authority requirements and airport acceptance before operation. The operator and pilot remain responsible for operational decisions.